CDP 250 MBH 2 Temperature Combi DHW System Panel with 3 Pumps

Printer-friendly version
Stk#: 
CDP250P3
Version: 
v1
CDP 250 MBH 2 Temperature Combi DHW System Panel with 3 Pumps
Status: 
New
Date Introduced: 
April 29, 2011

The CDP220 and 250 Combi Panels operate as high/low temperature distribution centers, with a boiler (or other non-DHW appliance) as a heat source. The CDP220 and 250 each have two high temperature branches, one for the indirect-fired DHW tank (with priority) and one for the high temperature heating application. The thermostatic control head in the 3-way mixing valve will automatically regulate the water temperature in secondary circuit.
Note: When used with boilers requiring a 3rd input a different wiring harness is required (e.g. IBC boilers). Call for details.

Related Literature

Theme by Danetsoft and Danang Probo Sayekti inspired by Maksimer